top of page
Buscar
  • Bruce Colson

Job Story: Duqm Liquid Bulk Berths Project, Sultanate of Oman

Atualizado: 19 de set. de 2021


ESC Scope of Supply

LSAW Pipe

ESC was awarded the job to supply 5,046MT of painted LSAW pipe (specification: OD1219mm/4ft, thickness 22mm/0.86inch, length from 13m ~ 24.5m/42ft to 80ft) with material API Spec. 5L grade X60. The LSAW steel pipe is required to be fabricated in accordance with client supplied project specific specifications.

The Government of The Sultanate of Oman is in the process of developing Duqm town and the Port of Duqm, as a strategic dry dock, free trade zone, industrial and tourism destination. The Port of Duqm is seen as a catalyst for the development of the Al Wusta region. The Port and Dry Dock are being developed to increase the trade; i.e. cargo trans-shipments, ship repair, manufacturing and tourism. The site enjoys proximity to the busy regional sealanes of Oman’s coastal waters and is characterized by a friendly climate. READ MORE!


58 visualizações0 comentário
bottom of page